Skip to content
Preflight Audit
EnteleSCAN logo

PFA-2026-000016

G49

EnteleSCAN

Internal Technical Assessment — Launch Readiness + Architecture Review · Multi-chain

www.entelekron.io
Publié

Personne Morale

TVK Labs & Technologies Ltd.

Industrie

Infrastructure

Version « évaluation complète » :

1.0.0

Date d’évaluation

April 1, 2026

Launch Readiness

86/100

Niveaux de risque

moderate

Cette évaluation est publiée dans le registre public permanent. Le statut « Publié » conserve le dossier d’évaluation sans revendiquer de certificat actuel, d’accréditation ou de reconnaissance par un programme externe.

Résumé exécutif

Preflight assessed EnteleSCAN's explorer and indexer architecture — covering data integrity patterns, transparency center integration, indexing reliability, and launch readiness within the EnteleKRON ecosystem.

Champ d'application de l'évaluation

  • Indexer architecture and data pipeline review
  • Transparency center integration assessment
  • Data integrity and reconciliation patterns
  • Launch disclosure and operational readiness
  • Compliance pattern screening

Technologies examinées

Multi-chainExplorerIndexerTransparencyData Integrity

Méthodologie

Preflight legacy assessment methodology

Synthèse des risques

Risk classification: moderate. 0 critical, 0 high, 2 medium, and 5 low findings across 7 total items reviewed.

Launch Readiness

Launch readiness score of 86/100. No critical or high-severity blockers remain at assessment completion.

Synthèse de l’infrastructure

Indexer architecture and data pipeline review

Préparation opérationnelle

Explorer architecture aligned with modular protocol rollout

Revue de sécurité

Security surfaces reviewed within Internal Technical Assessment — Launch Readiness + Architecture Review scope including access controls and integration boundaries.

Répartition des résultats

critical0
high0
medium2
low5

Points forts

  • Explorer architecture aligned with modular protocol rollout
  • Transparency patterns support public verification workflows
  • No critical or high-severity blockers at assessment completion

Recommandations

  • Maintain indexer redundancy before high-traffic mainnet events
  • Continue public documentation of data source boundaries

Historique de l’évaluation

  1. April 1, 2026

    Version 1.0.0

    Published

    Preflight assessed EnteleSCAN's explorer and indexer architecture — covering data integrity patterns, transparency center integration, indexing reliability, and launch readiness within the EnteleKRON

  2. April 1, 2026

    Issued

    Assessment record PFA-2026-000016 published for EnteleSCAN; the permanent public record remains live without issuing a current verification certificate.

  3. April 1, 2026

    Updated

    Assessment remains live in the permanent public registry.

Permanent published assessment record retained with its original scope, findings and assessment score. It predates the current controlled QMS/evidence architecture; its published status does not represent a current verification certificate, accreditation or external-scheme recognition. A new controlled assessment is required before a current verified status, verification badge or certificate may be issued.